Website RFP template guide: what to include in a great RFP

Published: 13 February 2026 | Updated: 5 March 2026
Complete guide to writing effective website RFPs. Learn what sections to include, common mistakes to avoid, and why discovery improves proposal accuracy

Need to write an RFP for a website project but not sure what to include? You’re not alone.

Most organisations write their first website RFP based on templates they find online or by copying what other departments have done. The result? Vague requirements that get wildly different responses from agencies, making it impossible to compare proposals meaningfully.

This guide walks you through exactly what belongs in a website RFP, whether you’re building a new site from scratch or redesigning an existing one. More importantly, it explains why each section matters and what happens when you leave it out.

Fair warning:

If you’re reading this hoping for a simple copy-paste template, you’re going to be disappointed. There’s no one-size-fits-all RFP template because every organisation’s requirements are different. What you’ll get instead is the framework for creating an RFP that actually works for your specific situation.

Before you write your RFP: The uncomfortable truth

Here’s what most RFP guides won’t tell you: if you don’t know your requirements well enough to write a detailed RFP, you’re not ready to issue an RFP.

I know that sounds harsh. But think about it this way: you’re asking agencies to commit to a fixed price and timeline for work you haven’t fully scoped yet. That’s not fair to them, and it’s setting you up for scope creep, budget blowouts, and timeline delays.

The organisations that write effective RFPs have already done the hard work of:

  • Conducting user research to understand what users actually need
  • Auditing existing content and systems (for redesigns)
  • Defining measurable success metrics
  • Documenting technical requirements and constraints
  • Mapping out integration requirements
  • Understanding their internal capacity and timeline constraints

If you haven’t done this groundwork, you have two options:

  1. Do the discovery work first (either internally or with expert help through something like our Discovery Workshop), then write your RFP
  2. Write the best RFP you can with current knowledge, but acknowledge its limitations and expect proposals to include discovery phases

This guide assumes you’re taking option 2. Just know that option 1 produces better outcomes.

(If you’re wondering why discovery matters so much, read: Why website RFPs fail and how to fix yours)

Essential sections every website RFP must include

1. Organisation background and context

Why organisation background matters

Agencies need context to understand your organisation’s complexity, culture, and constraints. A university with 15 departments and complex governance is fundamentally different from a startup research institute, even if both need “a website for research.”

  • Why you’re doing this project now (what triggered it)
  • Current website URL (if redesigning)
  • Brief organisation overview (who you are, what you do, who you serve)
  • Key stakeholders involved in the project
  • Decision-making process and approval requirements

Examples of organisation background

Writing generic background that could apply to any similar organisation. Be specific about what makes your organisation unique and what constraints that creates for the project.

Vague: “We are a leading research organisation focused on healthcare innovation.”

Specific: “We’re a healthcare research institute with 12 research programs, 450 staff across 3 locations, and partnerships with 8 universities. Our current website was built in 2018 and has become difficult to maintain as programs have expanded. Decision-making involves program leads (12 people), communications team (4 people), and executive sign-off, with 2-week approval cycles.”

2. Project objectives and success criteria

Why project objectives and success criteria

Without clear objectives, agencies can’t determine if their proposed approach will actually solve your problems. And you can’t evaluate whether proposals align with what you’re trying to achieve.

Be clear and specific about what you want to achieve and how success will be measured. This should cover:

  • Specific, measurable objectives (not vague aspirations)
  • How you’ll measure success 6-12 months after launch
  • Problems the current website has (for redesigns)
  • What “success” looks like from different stakeholder perspectives
  • Priority ranking of objectives if trade-offs are needed

Examples of project objectives and success criteria

Writing objectives like “improve user experience” or “modernise our online presence” things that sound good but can’t be measured.

Strong objectives are specific, time-bound, and based on current performance:

  • Reduce time for researchers to find relevant publications from an average of 4 minutes to under 1 minute
  • Increase online course enquiries from 50 per month to 100 per month within 6 months of launch
  • Enable the content team to publish news articles without IT support (currently takes 2 days, target: same day)
  • Achieve WCAG 2.2 AA compliance across all user-facing pages (current site fails 47 criteria)
  • Support 10,000 concurrent users during enrolment periods without performance degradation (current site crashes at 2,000 users)

For research, healthcare, and education organisations specifically: Include objectives related to your sector’s unique needs, such as publication discoverability, data sharing, collaboration facilitation, student recruitment, patient engagement, and regulatory compliance.

3. Target audiences and user needs

What to include:

  • Primary audience segments (who uses your website and why)
  • Key tasks each audience needs to accomplish
  • Current pain points (if you know them from user research or analytics)
  • Geographic distribution of users (local, national, international)
  • Device and browser usage patterns (if available from analytics)
  • Accessibility requirements for your user base

Why it matters: Different audiences require different approaches. A website serving primarily researchers looking for publications requires different architecture than one focused on prospective students comparing programs.

What most organisations get wrong: Listing audience segments without explaining what each segment actually needs to do on the website.

Better approach:

Audience 1: Prospective PhD candidates (international, 25-35 years old)

  • Primary task: Find research programs aligned with their interests and assess admission requirements
  • Secondary tasks: Identify potential supervisors, understand funding options, compare with other institutions
  • Current pain point: Can’t easily filter programs by research area or methodology
  • Volume: ~500 unique visitors/month, 60% mobile, 40% from outside Australia

Audience 2: Current researchers (staff and students)

  • Primary task: Access institutional resources, update publications, manage profiles
  • Secondary tasks: Find collaboration opportunities, access data repositories, register for events
  • Current pain point: Multiple logins required for different systems, can’t update own profiles
  • Volume: ~200 unique visitors/week, 70% desktop, mostly on-campus access

4. Scope of work: What’s included vs excluded

What to include:

For redesigns:

  • Estimated content volume (number of pages, assets, types)
  • Content migration approach (what’s keeping, what’s archiving, who decides)
  • URL structure changes and redirect requirements
  • What’s being redesigned vs rebuilt vs kept as-is

For new builds:

  • Estimated content volume and types
  • Content creation responsibility (organisation vs agency)
  • Whether content strategy/copywriting is included in scope

For all projects:

  • Key features and functionality required
  • Integrations with existing systems
  • User account/authentication requirements
  • Multi-language support (if applicable)
  • What’s explicitly out of scope

Why it matters: Scope ambiguity is the #1 cause of budget overruns and timeline delays. The more specific you can be, the more accurate proposals will be.

What most organisations get wrong: Underestimating content volume, not clarifying who’s responsible for what, and not explicitly stating what’s out of scope.

Specific example for content scope:

“Current website has approximately 2,847 pages across the following content types:

  • Research program pages (45 pages) — migrate all, update format
  • Staff profiles (450 pages) — migrate all, integrate with publication system
  • Publications (1,200 pages) — integrate via API with institutional repository, don’t migrate individual pages
  • News articles (800 pages) — migrate articles from last 2 years (approximately 200), archive remainder
  • Event pages (352 pages) — don’t migrate, integrate with new events calendar system

Content audit will be completed by [organisation/agency — specify who] by [date]. Final migration list will be provided before development begins.”

5. Technical requirements and constraints

What to include:

  • Platform preferences or constraints (if any)
  • Hosting environment and requirements
  • Security and compliance requirements
  • Performance requirements (page load speeds, concurrent users)
  • Browser and device support requirements
  • Accessibility compliance level (WCAG 2.2 AA minimum)
  • SEO requirements and current baseline

Why it matters: Technical constraints significantly impact cost and approach. Agencies need to know if they’re working within your existing infrastructure or have flexibility to recommend alternatives.

What most organisations get wrong: Either being too prescriptive (“must be WordPress”) without understanding if that’s the right fit, or too vague (“modern, fast website”) without defining what that means.

Better approach:

“Platform: No strong preference, but preference for open-source platforms with active developer communities. Must support our content team’s technical capabilities (HTML/CSS comfortable, minimal JavaScript experience).

Hosting: Must be compatible with university hosting infrastructure (Linux, Apache, PHP 8.1+, MySQL). Alternatively, propose managed hosting solution with associated costs.

Performance: Core Web Vitals targets: LCP < 2.5s, FID < 100ms, CLS < 0.1 on 4G mobile connection. Must support 5,000 concurrent users during peak enrolment periods.

Compliance: Must meet university security requirements (list available on request), WCAG 2.2 AA compliance required across all pages, privacy compliance for GDPR and Australian Privacy Principles.

Browser support: Last 2 versions of Chrome, Firefox, Safari, Edge. Mobile-responsive required (60% of traffic is mobile).”

6. Integration requirements

What to include:

  • Every system that needs to integrate with the website
  • Type of integration (API, data sync, SSO, embedded iframe)
  • Data flow direction (read-only, write, bidirectional)
  • API documentation availability
  • Current integration owner/technical contact
  • Volume/frequency of data exchange

Why it matters: Integration complexity is often underestimated and can double project costs if not scoped properly. Agencies need detailed information to quote accurately.

What most organisations get wrong: Mentioning systems that need to integrate without providing details about how, or not mentioning integrations at all because “we assume that’s standard.”

Example integration specification:

Integration 1: Salesforce CRM

  • Purpose: Capture form submissions for research collaboration enquiries
  • Type: API integration, real-time
  • Data flow: Website → Salesforce (one-way)
  • Volume: Approximately 200 form submissions/month
  • API documentation: Available (Salesforce REST API)
  • Technical contact: [Name, email]
  • Required fields: Name, email, organisation, research area, enquiry details

Integration 2: DSpace institutional repository

  • Purpose: Display researcher publications on staff profile pages
  • Type: API integration, cached daily
  • Data flow: DSpace → Website (read-only)
  • Volume: ~500 publications, updated weekly
  • API documentation: Available (DSpace REST API v7)
  • Technical contact: [Name, email]
  • Display requirements: Title, authors, publication date, DOI, abstract

7. Timeline and milestones

What to include:

  • Desired project start date
  • Target launch date (with flexibility buffer)
  • Key internal milestones or constraints
  • Stakeholder availability for workshops, reviews, approvals
  • Any immovable deadlines (accreditation reviews, major events, funding reporting)
  • Internal approval process timing

Why it matters: Unrealistic timelines lead to rushed work, quality compromises, or inevitable delays. Agencies need to know your actual constraints and flexibility.

What most organisations get wrong: Setting arbitrary launch dates without understanding how long things actually take, or not disclosing internal constraints that will slow the project down.

Realistic timeline example:

“Project timeline:

  • RFP responses due: 15 March 2026
  • Agency selection and contracting: By 31 March 2026
  • Project start: 7 April 2026
  • Target launch: September 2026 (flexible by 4-6 weeks)

Internal constraints:

  • University closed 22 Dec 2025 – 6 Jan 2026 (no stakeholder availability)
  • Peak enrolment period Feb-March (limited stakeholder availability)
  • Must launch before major accreditation review in November 2026

Stakeholder availability:

  • Communications Director: 5 hours/week
  • Content team: 10 hours/week (Feb-March: 5 hours/week)
  • IT team: 3 hours/week for technical requirements and integration support
  • Program leads: Available for 2-hour workshops only, 3 weeks notice required

Approval process: Design concepts require 2 weeks for stakeholder review and sign-off. Major milestone approvals require executive presentation (scheduled monthly).”

8. Budget parameters

What to include (controversial advice):

Include a budget range. I know many procurement people say not to, but here’s why you should:

  • Filters out agencies who can’t deliver in your range (saves everyone time)
  • Gets you proposals that fit your constraints rather than agencies’ ideal scope
  • Prevents the awkward “this is 3x our budget” conversation after weeks of meetings
  • Shows you’ve done enough planning to know rough project size

What to include:

  • Budget range for agency fees (e.g., “$80K-$120K”)
  • What’s included vs excluded in that budget
  • Flexibility for scope adjustments
  • Payment terms preferences
  • Whether ongoing support/maintenance is in scope

Why it matters: Without budget guidance, you’ll get proposals ranging from $50K to $250K because agencies make completely different assumptions about scope and quality level.

What most organisations get wrong: Not including any budget guidance, then being frustrated when proposals vary wildly or all exceed available budget.

Example budget guidance:

“Budget: $90K-$130K for initial build, flexible for justified scope additions discovered during discovery phase. Preference for fixed-price contracts with milestone-based payments. Separate budget available for 12-month post-launch support if proposed.”

9. Proposal requirements and evaluation criteria

What to include:

  • Required proposal format and structure
  • Specific questions you want answered
  • Examples of similar work to provide
  • Team member information required
  • Pricing breakdown expectations
  • Reference requirements
  • How proposals will be evaluated
  • Selection timeline

Why it matters: Clear requirements make proposals easier to compare. Sharing evaluation criteria helps agencies understand what you value.

What most organisations get wrong: Not being specific about what they want to see, then struggling to compare proposals that all use different formats and emphasis.

Example proposal requirements:

“Proposals must include:

  1. Approach and methodology (max 3 pages): How you would approach this project specifically, including discovery/research phase if recommended
  2. Team (max 2 pages): Specific people who would work on this project, their roles, relevant experience. Include % allocation to this project.
  3. Timeline (max 1 page): Proposed timeline with key milestones. Identify any timeline risks or constraints.
  4. Pricing (max 2 pages): Itemised breakdown by phase/deliverable. Identify any assumptions. Specify what’s included vs additional.
  5. Similar work examples (max 3 examples): Projects of similar complexity (not necessarily same sector). For each: client, challenge, solution, outcome, your role, URL.
  6. References (minimum 2): Client name, project, contact person and email. Preference for references from similar organisation size/complexity.

Evaluation criteria (weighted):

  • Approach and methodology fit for our requirements (30%)
  • Team capability and relevant experience (25%)
  • Similar project examples and references (20%)
  • Pricing and value (15%)
  • Timeline and availability (10%)

Selection process:

  • Proposals due: 15 March 2026
  • Shortlist announced: 22 March 2026
  • Shortlisted agency presentations: 25-27 March 2026
  • Final selection: 31 March 2026
  • Contract negotiations: 1-7 April 2026

Agencies are welcome to request a 30-minute clarification meeting before submitting proposals.”

10. Meet with agencies who request it

This isn’t technically part of the RFP document, but it’s critical to getting accurate proposals:

Make yourself available for brief meetings with agencies before they submit proposals.

Agencies are investing 20+ hours into your proposal — that’s easily $4,000+ of their time at standard rates. The least you can do is give them 30 minutes to ask clarifying questions and understand your requirements properly.

Here’s our policy at Marameo: we don’t respond to RFPs unless we’ve met with the team at least once beforehand. Why? Because without that conversation, we’re just guessing at what you actually need. And guessing leads to inaccurate quotes, which leads to exactly the problems we’ve been discussing.

If an agency asks for a brief meeting before submitting their proposal, that’s a good sign — they’re trying to quote accurately, not just throw numbers at a wall and hope something sticks.

What this template won’t fix (and why you need a Digital Discovery Workshop)

Even with all these sections completed thoroughly, your RFP will only be as good as the research and planning that went into it.

If you’re guessing at user needs, approximating content volume, or assuming technical requirements, agencies will still be guessing when they quote. The proposals will be more consistent than with a vague RFP, but they’ll all be consistently based on your unvalidated assumptions.

The projects that run smoothest aren’t the ones with the best RFP templates, they’re the ones that did proper discovery before writing the RFP.

Proper discovery means:

  • Actual user research (interviews, usability testing, analytics analysis)
  • Complete content audit with traffic and engagement data
  • Technical requirements documented by people who understand the implications
  • Integration requirements validated with system owners
  • Success metrics defined and baseline measurements taken
  • Stakeholder alignment on priorities and trade-offs

You can do this discovery work internally if you have the expertise and capacity. Or you can work with specialists who do this for a living.

That’s exactly why we created our Discovery Workshop as a standalone service. It’s a fixed-scope, 6-8 week engagement that gives you everything you need to write an RFP that actually works — or skip the RFP entirely and move straight to delivery with clear requirements.

The discovery outputs become your RFP. You can take that to 10 agencies if you want, or you can work with us for delivery, or you can scope it internally. The discovery has value regardless of who builds the website.

The choice you’re actually making

Writing an RFP forces you to make a choice:

Option 1: Write the best RFP you can with current knowledge

  • Pros: Feels faster, can get started sooner, familiar process
  • Cons: Proposals based on assumptions, scope creep likely, possible budget overruns

Option 2: Do discovery first, then write your RFP

  • Pros: Accurate proposals, minimal scope creep, predictable costs, measurable outcomes
  • Cons: Requires upfront investment (10-15% of project cost) but save money in the long run

Most organisations choose Option 1 because it feels faster and cheaper. Then they spend 40% more than planned and wonder why the project went off the rails.

Smart organisations choose Option 2.
They invest in understanding the problem before they invest in solving it. They get accurate quotes from agencies. Their projects run smoothly. They can prove ROI because they defined success upfront.

Which option makes sense for your organisation?

Next steps

If you’re writing an RFP for a website project:

1. Use this framework to structure your RFP. The more specific you can be in each section, the more accurate proposals will be.

2. Be honest about gaps in your knowledge. If you don’t know content volume, say so and ask agencies to include a content audit phase. If technical requirements are unclear, acknowledge it and budget for discovery.

3. Make yourself available for clarification meetings. 30 minutes with each interested agency will improve proposal quality significantly.

Or, if you’re ready to skip the RFP headaches entirely:

Learn about our Discovery Workshop — a fixed-scope engagement that gives you bulletproof requirements whether you work with us or someone else.

Book a 30-minute RFP review call — Send us your draft RFP and we’ll give you honest feedback on what’s missing and what could be clearer. No charge, no obligation.

Because watching organisations waste time on broken RFP processes when there’s a better way frustrates the hell out of me.

Let’s fix this.

Book your FREE clarity call

Let's amplify your impact and drive change

Book your project